CSOwise % of Dharasevak exist in connection with Total Watershed.
CSOwise % of MWS considered in 1st phase related to Total Watershed.
CSOwise % of Dharasevak trained related to Dharasevak engaged.
CSOwise status on Watershed and Dharasevak
At a glance : CSOwise Watershed vis-a-vis Dharasevak
Sl. CSO Name Total No.of Watershed Total No.of Watershed do not require Dharasevak No.of Watershed Where Dhasevak Name updated No.of Watershed to be updated No.of Dharasevak trained No.of MWS in 1st Phase
1 DRCSC 204 2 200 2 194 39
2 LOKA KALYAN PARISHAD 238 68 139 31 136 71
3 PRADAN 1058 5 1009 44 889 439
4 PRASARI 201 0 102 99 101 64
5 RDA 249 47 210 -8 210 70
6 SAMAYITA MATH 219 0 193 26 154 48
7 TSRD 196 0 195 1 185 79
TOTAL 2365 122 2048 195 1869 810
Back to Top