Sl. Block GP Mouza UM Code Visitor Name Designation Level Work Name Work Type Work Code Work Status Date of visit Observation Remark Photo
1 BARABANI BARABANI Bhanora WBMBAR021 Shyabaschi Mukherjee Programme Assistant BLOCK Orcrahds Plantation Near MKB Bhata Orchard 1901010586 Ongoing 24-06-2019 Plantation work is ongoing. All Mango trees are survived. Good Initiative.
2 BARABANI ITAPARA Amnala WBMBAR011 Ayan Das Technical Assistant BLOCK Mango Orchars At Amnala Orchard 22012034414613 Ongoing 30-05-2019 good Initiative.
3 HURA KALABANI Kalabani PURHUR002 PIU SENGUPTA TECHNICAL ASSISTANT BLOCK EXCAVATION OF HAPPA OF SUBHASH SAREN AT HIR LowLand FarmPond 3214003005/IF/321002040958236 Ongoing 11-07-2019 Permanent CIB Board is not constructed in the site. excavation of one side of the scheme was not done properly. NS is requested to arrange for constructed permanent CIB board and excavation should be done in popper way .Scheme should be completed as early as possible.
4 HURA KALABANI Kalabani PURHUR002 Gopinath Acharjee TECHNICAL ASSISTANT BLOCK Excavation Of Huppa Of Babujan Hembram At Hir LowLand FarmPond 3214003005/IF/321002040960693 Ongoing 11-07-2019 No display board is found in the site.Excavation of earth was not done properly. NS is requested to arrange for construct permanent CIB board and excavation should be done properly.The scheme should be completed as early as possible.
5 DURGAPUR FARIDPUR LAUDOHA Bhadrapur WBMFRD012 Dr.Sumit Roy & team Programme officer in BRLF Pasc STATE LAND DEVELOPMENT AND PIT CUTTING AT BHADRAPUR AT JHANJRA Orchard 3202014005/LD/321002040766113 Ongoing 09-07-2019 1. Bush cutting is not in regular basis. 2. 30-40 model is not properly maintained. 1.30-40 model should be maintained. 2. Bush cutting should be done to nurture the plants.
6 ANDAL KAJORA Kajora WBMAND007 Ayan Goswami Technical Assistant BLOCK RE-EXCAVATION OF KAMLA PUKUR (USHERMUKTI) Parcolation/Harvesting Tank 3202015003/WC/321002040849094 Ongoing 07-06-2019 Slope gradient is steep. There is a possibility of Re siltation & breaking during monsoon. The Scheme is Ongoing. Quantum of physical output is satisfactory.
7 ANDAL KAJORA Kajora WBMAND007 Dr. Sumit Roy Programme Officer, BRLF STATE Creation Of Arjun Plantation (Sericulture Project) At Roy Dutta Forestry 3202015003/DP/22012034481290 Ongoing 08-07-2019 Cleaning and mulching required around the plants. The Pond at the down most portion of the area may be focused as water reservoir. The scheme is good and will be effective in Ushar Mukti concept.
8 ANDAL ANDAL Dignala WBMAND012 Achin Bhattacherjee Technical Assistant BLOCK RE-EXCAVATION & EMBANKMENT PROTECTION BY EATH FROM END DIGNALA VILLAGE TO SHIB MANDIR OF SANKRA VILLAGE OF SINGARAN Field Channel 3202015001/FP/320201060438887 Ongoing 26-04-2019 Quality of the work is satisfactory. Digging of Earth from the river bed should be uniform along the course of the river. Ongoing scheme. Quality of the work is satisfactory.
9 ANDAL ANDAL Dignala WBMAND012 Ayan Goswami Technical Assistant BLOCK RE-EXCAVATION OF FIELD CHANNEL FROM BAGAJORA TO SANGESWARI MANDIR ALONGWITH CHECK DAM NEAR BAGAJORA Field Channel 3202015001/FP/320201060438881 Ongoing 18-04-2019 Dug earth should be stacked away from the slope. other wise there is a chance of washing on deposited by rain water. Quantum of the work is satisfactory.
10 ANDAL ANDAL Andal WBMAND012 Ayan Goswami Technical Assistant BLOCK RE-EXCAVATION OF EARTHEN DRAIN FROM BACK SIDE OF G.P OFFICE TO DVC WALL Field Channel 3202015001/FP/320201060456179 Ongoing 24-04-2019 Dug earth should be stacked away from the slope. There is a possibility of Re siltation & breaking during monsoon. Quality of the work is satisfactory.
11 ANDAL KHANDRA Siduli WBMAND004 Achin Bhattacherjee Technical Assistant BLOCK SOCIAL AFFORESTATION WITH CATTLE TRENCH AT KUCHIPARA MAJHIPARA AREA Contour Trench 3202015004/DP/22012034470708 Ongoing 16-04-2019 Dug earth should be stacked away from the slope. otherwise there is a chance of washing on deposited by rain water. Quality of the work is satisfactory.
12 ANDAL DAKSHIN-KHANDA Madhusudanpur WBMAND003 Ayan Goswami Technical Assistant BLOCK Plantation At Front Side Of Palashdanga Aam Bagan Orchard 3202015002/DP/22012034324757 Ongoing 25-03-2019 Cleaning and mulching required around the plants. Ongoing scheme. The quality of the work is not bad at all.
13 ANDAL KAJORA Kajora WBMAND007 Ritwick Hazra BDO, Andal BLOCK Creation Of Arjun Plantation (Sericulture Project) At Roy Dutta Forestry 3202015003/DP/22012034481290 Ongoing 17-06-2019 Cleaning and mulching required around the plants. Take water conservation schemes like 30-40 model contour tranch etc. Ongoing scheme. Quality of the work is good
14 KANKSA BONKATI Satkahaniya WBMKAN038 Soumitra Biswas Program Associate CSO Making Fruit Garden With 3040 Model With Convergence Of Horticulture By Pathik SHG At Sathkahaniya Orchard 3202013002/DP/321002040882589 Work Started 22-08-2019 *size of pit 1mx1mx1m, *Distance between two pits 5mx5mx5m *Supervised by Pathik SHG
15 ANDAL ANDAL Andal WBMAND012 1. Shantimoy Barat 2. Poulami Mitra 1. Technical Assistant 2. PC& DISTRICT RE-EXCAVATION OF EARTHEN DRAIN FROM BACK SIDE OF G.P OFFICE TO DVC WALL Field Channel 3202015001/IC/130717778396 Ongoing 04-09-2019 Ongoing Scheme. Slope gradient is steep. Cleaning required around the drain in rainy session. Quality of the work is satisfactory